Shelf With Pegs

Shelf With Pegs

Shelf With Pegs

Shelf With Pegs

This write-up will describe how to construct a 4 foot extended ornamental shelf using basic woodworking resources including a cordless drill. I use Dewalt cordless drills for numerous factors. Initial, I have found that they have the longest long lasting batteries. I develop these shelves for a residing, and can construct 10 or much more shelves on 1 charge. They have the most electrical power, and the depth settings really perform. Now let us get to building the shelf.

The first factor is to choose your wood, I use mainly pine but some clients choose cedar. You will want to select up one 1 X six board that is 10 ft in duration. Make certain the board is straight, no bows or twist, or it will be more difficult to set the shelf collectively. I select boards that have no chunks out of the solid wood, no cracks, splits, and not also many knots. Although selecting out your lumber choose up 5 shaker pegs, and some one 5/8 inch wood screws, it will take eight to 10 for the shelf. As soon as you have chosen your timber it is time to go to the store and begin building.

Get your board and lower two four foot pieces, 1 will be the again, one will be the top, and the leftover 2 ft will be employed to cut the brackets. I choose the best of the two 4 foot boards as the back again since it will be seen the most. Most of my customers want patterns lower into the back of their shelf, but it is not required. I have created soul, star, horses, and many other styles that I lower into the back again of the shelves I build. If you want you can pick a pattern and lay them out evenly along the backboard and cut them out with a jigsaw. If not it is time to add the pegs.

Evaluate and lay out your pegs, I usually set in four pegs, one each and every ten inches. Once you have decided on peg location drill the holes for the pegs. You will need your Dewalt cordless drill and a three/eight inch drill little bit. Drill the hole about 50 percent way by way of the again board. When you have this completed it is time to reduce your brackets. Lay the again and top boards in the fashion that they will be when built. Maintain the leftover piece of board in the corner of the shelf and attract out a bracket. Use a jigsaw to reduce the brackets out.

Now it is time for assembly of the shelf. Make a mark on the back again of the board four inches from each and every edge, this is how significantly in I place the brackets from the edges. Use clamps to maintain the brackets in place and change the back board above. Right here I use two drills, one has a 5/16 Th inch little bit for pre-drilling holes, the other has a Phillips head bit for driving the timber screws. Pre-drill two holes into the back again of each bracket then connect them to the back board utilizing the wood screws. Remove the clamps, change the back again board above and lay it on a flat surface area with the brackets dealing with up. I now line up the top board and clamp it into location.

Now start at a single end of the shelf, make positive every thing is lined up, pre-drill a hole in the corner for your first screw. Once this is carried out use the drill to insert a timber screw, I set in a screw about each 10 inches. If your board is warped it might get an added screw or two. When this is done use your drill to make two a lot more pilot holes for the brackets, a single in each and every. When the pilot holes are drilled shoot a wood screw via the top board into the brackets. Eliminate the clamps and you have just completed a four foot ornamental shelf using a Dewalt cordless drill.

Share

Shelving Ideas articles